EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
phowe
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (415)
Research
- (1)
Workshop
- (2)
Empennage
- (2)
Fuselage
- (71)
Firewall
- (11)
Tail Feathers
- (37)
Wings
- (86)
Controls
- (11)
Avionics
- (30)
Lighting
- (13)
Instrument Panel
- (6)
Landing Gear
- (16)
Engine
- (30)
Propeller
- (7)
Fuel System
- (18)
Interior Finish
- (46)
-
Vents
-
Rudder Return Kit
-
Rudder Return Kit
-
Rudder Return Kit
-
Side Seat Closeout
-
Plastic Seat Closeouts
-
Control Cable Closeout
-
Control Column...
-
Baggage Area Floor
-
Flap Handle Closeouts
-
Side Closeouts
-
Flap Handle Issue
-
Baggage Area Floor
-
Side closeout Next...
-
Flap Handle
-
Doors
-
Flap Handle
-
Plastic Station 3...
-
Fluid connection to...
-
Cabin Heater
-
Heater
-
Cabin Heater
-
Doors
-
Doors
-
Brakes
-
Doors
-
Located parts for...
-
Test fitted/...
-
Match drilled...
-
FINISH SEAT
-
Assembly of control...
-
Baggage Area skins
-
Seats
-
Seat
-
Assembly of control...
-
Cloth on baggage...
-
Second Seat
-
2nd Seat
-
Seats
-
Seats
-
Seat rails
-
seats
-
Started to work on...
-
Constructing seats
Rigging
- (6)
Paint / Decals
- (10)
Inspection
Tools
MISC
- (12)
Builder Name:
Philip Howe
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1711.75
Total Flight Time:
6
Total Expense:
N/A
Start/Last Date:
Oct 19, 2020 - No Finish Date
Engine:
Rotax 915is
Propeller:
Whirlwind
Panel:
Dynon
Friendly URL:
https://eaabuilderslog.org?s=phowe
Home or Last Project Picture
Dec 09, 2021
Located parts for the rudder cable system
- (1 hour)
Category: Interior Finish
Located all the parts need to attach the rudder cables to the rudder pedals
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.